# What is the completeness score?
> What the Completeness ring measures and the 30% threshold for a full evaluation.
Source: https://help.computelabs.ai/vi/docs/financing-platform/for-operators/completeness-score
Language: vi

The **Completeness** ring at the top of the Findings panel shows how much of your deal information our system was able to capture from your fields and documents, as a percentage.

- Scores above **30%** unlock a full evaluation. Below that, the **Start your Deal Evaluation** button is disabled and its tooltip shows the current score.
- The higher the score, the deeper and more useful the analysis. Each document you add and each missing field you fill in improves it.
- The ring is red below 40%, orange from 40% to 69%, and green at 70% and above.

Under the ring, a summary tells you what would raise the score, for example the number of missing fields or open reviewer questions. Click **Fill in Missing Info** to go directly to those items, or upload more documents on the left.

Each time analysis runs, a new revision is produced with its own score; the label under the ring shows the revision number, score, and date.
